Foreman of a construction organization - free course from the Russian School of Management, training 16 hours, date: December 3, 2023.
Miscellaneous / / December 07, 2023
Foreman is a construction worker, the head of a facility. To manage a modern construction site and manage contracting teams, he needs special training. Our course “Foreman of a Construction Organization” will provide the necessary knowledge and develop the necessary competencies for this work.
In the program we will examine issues of the regulatory framework in construction, discuss the principles organization and planning of construction work, logistics support for construction production. We will work out the issues of filling out applications for construction equipment, structures, materials, the procedure for drawing up reporting documentation, we will systematize construction control tools, explain the requirements of regulatory, technical and design documentation for the composition and quality of construction work, we will cover issues of control and compliance with rules and instructions on labor protection and fire safety security.
Organization of work in construction
• Regulatory documentation on the organization of construction. Basic functions of the Developer and Contractor.
• Requirements for construction management specialists. Order of the Ministry of Construction of Russia dated 04/06/2017 No. 688/p.
• Organizational and technological schemes of construction. Selection and justification of construction organization methods.
• Construction scheduling.
• Network modeling of construction production.
• Organizational and technological documentation.
• Organization of the construction site. Stroygenplan.
• Preparation period. Engineering preparation of the construction site.
• Organization of logistics.
• Fundamentals of construction production management. Construction culture.
Construction control. Quality management in construction
• Regulatory framework for construction control. State regulation of construction.
• Main tasks of construction control. Division of functions between the Developer and the Contractor.
• Organization of incoming inspection: incoming inspection of design documentation and building materials/structures.
• Laboratory control and laboratory support of construction. Methods of destructive and non-destructive testing.
• Operational control during the execution and upon completion of construction and installation operations. Geodetic control.
• List of types of work subject to control. Quality control of work performed. Types of defects and their elimination.
• Inspection of hidden work.
• As-built documentation: list of documentation and maintenance order. Typical errors.
• Author's supervision of construction and installation works.
• Testing and testing of installed equipment. Handover and acceptance of a capital construction project into operation.